# 93 Rx7 Ls2 Project.

**URL:** <https://forums.speedlife.net/t/93-rx7-ls2-project/196180>\
**Category:** Builds\
**Created:** [March 18, 2008, 5:45am UTC](https://forums.speedlife.net/t/93-rx7-ls2-project/196180 "2008-03-18T05:45:59Z")\
**Posts on this page:** 1\
**Showing post:** 69

<div class="post-metadata">

**Author:** ![czwalga00gt](https://avatars.discourse-cdn.com/v4/letter/c/6bbea6/32.png) [@czwalga00gt](https://forums.speedlife.net/u/czwalga00gt)\
**Post date:** [August 8, 2008, 6:18am UTC](https://forums.speedlife.net/t/93-rx7-ls2-project/196180/69 "2008-08-08T06:18:34Z")

</div>

> [@Goodbye Buffalo...](https://forums.speedlife.net/t/goodbye-buffalo/37380/15):
>
> That is going to look awesome when it is done. What is left to do after paint? After the engine is dropped back in are you done or do you still have suspension/electronics work to do?

The engine needs to be dropped in. I finished my fuel system and cooling setup. Most of the electronics are done, however I have not tested it yet so… who knows haha. :eek4:

Once it’s back from paint i’d say a month of solid work and i’ll be atleast driving/testing it out. Keep in mind i was planning on driving this thing in june though.

---

_[View the full topic](https://forums.speedlife.net/t/93-rx7-ls2-project/196180)._
