# Anyone need concrete work done?

**URL:** <https://forums.speedlife.net/t/anyone-need-concrete-work-done/190592>\
**Category:** PittSpeed Off Topic\
**Created:** [June 17, 2007, 11:37am UTC](https://forums.speedlife.net/t/anyone-need-concrete-work-done/190592 "2007-06-17T11:37:28Z")\
**Posts on this page:** 1\
**Showing post:** 12

<div class="post-metadata">

**Author:** ![tom\_vito](https://yyz2.discourse-cdn.com/flex034/user_avatar/forums.speedlife.net/tom_vito/32/6000_2.png) [@tom\_vito](https://forums.speedlife.net/u/tom_vito)\
**Post date:** [June 18, 2007, 2:48pm UTC](https://forums.speedlife.net/t/anyone-need-concrete-work-done/190592/12 "2007-06-18T14:48:45Z")

</div>

> [@network access problems](https://forums.speedlife.net/t/network-access-problems/30803/5):
>
> For the risers of the steps it’s easier to get a formliner for the height of the riser. If he doesn’t have them already, they’re expensive. Probably doesn’t if he doesn’t want to do em.

I know that is one way to go. But I have seen guys, that had the experience, just pull the forms, at the right time, and then dye and stamp the faces. In my opinion this way gives a much nicer, real stone look that just doesn’t happen when using riser form stamps.

---

_[View the full topic](https://forums.speedlife.net/t/anyone-need-concrete-work-done/190592)._
