# parkway feedback

**URL:** https://forums.speedlife.net/t/parkway-feedback/190359
**Category:** PittSpeed Off Topic
**Created:** [June 6, 2007, 11:03am UTC](https://forums.speedlife.net/t/parkway-feedback/190359 "2007-06-06T11:03:14Z")
**Posts on this page:** 19
**Page:** 2

<div class="post-metadata">

### Author: ![OLDS\_ROCKETMAN](https://yyz2.discourse-cdn.com/flex034/user_avatar/forums.speedlife.net/olds_rocketman/32/5942_2.png) [@OLDS\_ROCKETMAN](https://forums.speedlife.net/u/OLDS_ROCKETMAN)
#### Post date: [June 6, 2007, 2:40pm UTC](https://forums.speedlife.net/t/parkway-feedback/190359/21 "2007-06-06T14:40:18Z")

</div>

just drive like its lap 199 at daytona.

everytime i cross the glenwood bridge some asshole commin off the carson street on ramp will just go without even yeilding when i’m barreling down… now if i’m in the blazer i don’t mind cause i would love to get a new daily when they smash into me. on the flip side if someone is not takin their turn and its basically standstill traffic i wedge the nose of my car in so they either hit me or let me. hopefully they hit me.

---

<div class="post-metadata">

### Author: ![imported\_fresh](https://avatars.discourse-cdn.com/v4/letter/i/e95f7d/32.png) [@imported\_fresh](https://forums.speedlife.net/u/imported_fresh)
#### Post date: [June 6, 2007, 3:23pm UTC](https://forums.speedlife.net/t/parkway-feedback/190359/22 "2007-06-06T15:23:43Z")

</div>

> [@WTR: House/Duplex/Townhouse](https://forums.speedlife.net/t/wtr-house-duplex-townhouse/29979/8):
>
> the work wouldn’t have to be done immediately if the maintenance was done over the life of the bridges… period.

blame the state government for always passing new f\*in standards.

---

<div class="post-metadata">

### Author: ![fshowcars](https://yyz2.discourse-cdn.com/flex034/user_avatar/forums.speedlife.net/fshowcars/32/5937_2.png) [@fshowcars](https://forums.speedlife.net/u/fshowcars)
#### Post date: [June 7, 2007, 6:04am UTC](https://forums.speedlife.net/t/parkway-feedback/190359/23 "2007-06-07T06:04:06Z")

</div>

> [@Anyone use a twizzler as a straw](https://forums.speedlife.net/t/anyone-use-a-twizzler-as-a-straw/30576/6):
>
> blame the state government for always passing new f\*in standards.

no… i’m going to ‘blame’ (moreso Point out it inadequacies of) the department built and founded by the ongoing preventative maintenance of the PA roadways.

---

<div class="post-metadata">

### Author: ![fshowcars](https://yyz2.discourse-cdn.com/flex034/user_avatar/forums.speedlife.net/fshowcars/32/5937_2.png) [@fshowcars](https://forums.speedlife.net/u/fshowcars)
#### Post date: [June 7, 2007, 6:04am UTC](https://forums.speedlife.net/t/parkway-feedback/190359/24 "2007-06-07T06:04:37Z")

</div>

> [@Qualcomm chip imports banned...sucks to be CDMA!](https://forums.speedlife.net/t/qualcomm-chip-imports-banned-sucks-to-be-cdma/30571/2):
>
> i just heard on DVE there closing down the SQhill tunnels outbound this weekend

that’s what this thread is about!!!

:slap:

---

<div class="post-metadata">

### Author: ![Darkstar](https://avatars.discourse-cdn.com/v4/letter/d/b487fb/32.png) [@Darkstar](https://forums.speedlife.net/u/Darkstar)
#### Post date: [June 7, 2007, 9:34am UTC](https://forums.speedlife.net/t/parkway-feedback/190359/25 "2007-06-07T09:34:00Z")

</div>

> [@Dyno: 07 ZO6](https://forums.speedlife.net/t/dyno-07-zo6/30473/16):
>
> Besides, it’s not PennDOT out there working (in most cases); those are construction crews that are consultants. PennDOT does the designing and these consultants are the ones that take their good old time.

even if thats the case, those companies get paid by the job, not by the hour so it SHOULD be in their best interest to get everything done ASAP.

---

<div class="post-metadata">

### Author: ![8Grand](https://yyz2.discourse-cdn.com/flex034/user_avatar/forums.speedlife.net/8grand/32/5940_2.png) [@8Grand](https://forums.speedlife.net/u/8Grand)
#### Post date: [June 7, 2007, 12:16pm UTC](https://forums.speedlife.net/t/parkway-feedback/190359/26 "2007-06-07T12:16:31Z")

</div>

I finally get to say North Side FTW… except when 28 floods

---

<div class="post-metadata">

### Author: ![imported\_fresh](https://avatars.discourse-cdn.com/v4/letter/i/e95f7d/32.png) [@imported\_fresh](https://forums.speedlife.net/u/imported_fresh)
#### Post date: [June 7, 2007, 12:57pm UTC](https://forums.speedlife.net/t/parkway-feedback/190359/27 "2007-06-07T12:57:14Z")

</div>

> [@Darkstar"](#):
>
> even if thats the case, those companies get paid by the job, not by the hour so it SHOULD be in their best interest to get everything done ASAP.

but just like most jobs there are dependencies…in this case time, money, supplies, and weather. those guys standing around are doing so because they have to wait until the other guy finishes what he is doing before the rest can move on. the process cannot be rushed.

---

<div class="post-metadata">

### Author: ![bics56](https://avatars.discourse-cdn.com/v4/letter/b/47e85d/32.png) [@bics56](https://forums.speedlife.net/u/bics56)
#### Post date: [June 7, 2007, 12:58pm UTC](https://forums.speedlife.net/t/parkway-feedback/190359/28 "2007-06-07T12:58:19Z")

</div>

> [@Dyno: 07 ZO6](https://forums.speedlife.net/t/dyno-07-zo6/30473/16):
>
> In defense of PennDOT the work going on with the bridges in those areas has to be done immediately because they are deteriorating…so do you want to suffer through the long traffic periods for a few months or chance the possibility of the bridge caving in on you as you pass under or fall out beneath you? PennDOT’s aim is to keep YOU safe.
> 
> Besides, it’s not PennDOT out there working (in most cases); those are construction crews that are consultants. PennDOT does the designing and these consultants are the ones that take their good old time.

The Company I work for is the “Construction Manger” for this (and most) road project…I should send the manager an e-mail to this link…hahaha

---

<div class="post-metadata">

### Author: ![JackdUp](https://yyz2.discourse-cdn.com/flex034/user_avatar/forums.speedlife.net/jackdup/32/6015_2.png) [@JackdUp](https://forums.speedlife.net/u/JackdUp)
#### Post date: [June 7, 2007, 1:19pm UTC](https://forums.speedlife.net/t/parkway-feedback/190359/29 "2007-06-07T13:19:18Z")

</div>

We await and welcome his repsonse to the thread, if he so chooses to address our concerns.

---

<div class="post-metadata">

### Author: ![bics56](https://avatars.discourse-cdn.com/v4/letter/b/47e85d/32.png) [@bics56](https://forums.speedlife.net/u/bics56)
#### Post date: [June 7, 2007, 1:56pm UTC](https://forums.speedlife.net/t/parkway-feedback/190359/30 "2007-06-07T13:56:22Z")

</div>

I just talked to him and he said Pittspeed FTMFL while grabbing his cock

---

<div class="post-metadata">

### Author: ![JackdUp](https://yyz2.discourse-cdn.com/flex034/user_avatar/forums.speedlife.net/jackdup/32/6015_2.png) [@JackdUp](https://forums.speedlife.net/u/JackdUp)
#### Post date: [June 7, 2007, 1:58pm UTC](https://forums.speedlife.net/t/parkway-feedback/190359/31 "2007-06-07T13:58:36Z")

</div>

At least he was entertaining.

---

<div class="post-metadata">

### Author: ![bics56](https://avatars.discourse-cdn.com/v4/letter/b/47e85d/32.png) [@bics56](https://forums.speedlife.net/u/bics56)
#### Post date: [June 7, 2007, 2:13pm UTC](https://forums.speedlife.net/t/parkway-feedback/190359/32 "2007-06-07T14:13:28Z")

</div>

Haha I was joking…do you think one of the heads of engineering has time to talk to me…a finance guy with 2 years of exp

---

<div class="post-metadata">

### Author: ![Lazylaser](https://yyz2.discourse-cdn.com/flex034/user_avatar/forums.speedlife.net/lazylaser/32/6033_2.png) [@Lazylaser](https://forums.speedlife.net/u/Lazylaser)
#### Post date: [June 7, 2007, 2:22pm UTC](https://forums.speedlife.net/t/parkway-feedback/190359/33 "2007-06-07T14:22:51Z")

</div>

> [@I \<3 Mandi](https://forums.speedlife.net/t/i-3-mandi/30584/566):
>
> I just talked to him and he said Pittspeed FTMFL while grabbing his cock

:bowrofl:

---

<div class="post-metadata">

### Author: ![JackdUp](https://yyz2.discourse-cdn.com/flex034/user_avatar/forums.speedlife.net/jackdup/32/6015_2.png) [@JackdUp](https://forums.speedlife.net/u/JackdUp)
#### Post date: [June 7, 2007, 3:17pm UTC](https://forums.speedlife.net/t/parkway-feedback/190359/34 "2007-06-07T15:17:24Z")

</div>

> [@WTB: late 60's to early 80's bike](https://forums.speedlife.net/t/wtb-late-60s-to-early-80s-bike/30297/26):
>
> Haha I was joking…do you think one of the heads of engineering has time to talk to me…a finance guy with 2 years of exp

meh, I yack with our CEO all the time… :dunno: I guess it’s possible that you’d have an “in”?

Seriously, it’d be nice to hear their perspective for once. We never hear from the people managing the projects’ side of things, just angry motorists. I’m sure there’s all kinds of scheduling/material/personnel/management crisis/problems/parts and what not.

---

<div class="post-metadata">

### Author: ![Shaggy](https://yyz2.discourse-cdn.com/flex034/user_avatar/forums.speedlife.net/shaggy/32/5945_2.png) [@Shaggy](https://forums.speedlife.net/u/Shaggy)
#### Post date: [June 7, 2007, 3:59pm UTC](https://forums.speedlife.net/t/parkway-feedback/190359/35 "2007-06-07T15:59:47Z")

</div>

Its officially a parkway now :bash: :rolleyes:

---

<div class="post-metadata">

### Author: ![Shaggy](https://yyz2.discourse-cdn.com/flex034/user_avatar/forums.speedlife.net/shaggy/32/5945_2.png) [@Shaggy](https://forums.speedlife.net/u/Shaggy)
#### Post date: [June 7, 2007, 4:05pm UTC](https://forums.speedlife.net/t/parkway-feedback/190359/36 "2007-06-07T16:05:24Z")

</div>

> [@MR2 Died on me, and won't start. Help needed ASAP](https://forums.speedlife.net/t/mr2-died-on-me-and-wont-start-help-needed-asap/30593/6):
>
> I finally get to say North Side FTW… except when 28 floods

And deadly wrecks like yesterday

---

<div class="post-metadata">

### Author: ![bics56](https://avatars.discourse-cdn.com/v4/letter/b/47e85d/32.png) [@bics56](https://forums.speedlife.net/u/bics56)
#### Post date: [June 7, 2007, 5:40pm UTC](https://forums.speedlife.net/t/parkway-feedback/190359/37 "2007-06-07T17:40:28Z")

</div>

> [@Sweet new purchase](https://forums.speedlife.net/t/sweet-new-purchase/30602/2):
>
> meh, I yack with our CEO all the time… :dunno: I guess it’s possible that you’d have an “in”?
> 
> Seriously, it’d be nice to hear their perspective for once. We never hear from the people managing the projects’ side of things, just angry motorists. I’m sure there’s all kinds of scheduling/material/personnel/management crisis/problems/parts and what not.

Ya The company is pretty big…5000 employees about 65 offices and I work at the home office. My boss is the CFO so I talk to the higher ups a lot in the executive side…on the engineering side I really do not talk to those guys unless there is an issue financially related. But I see what you are saying we are all just people. Yeah there is a lot of planning from what I can tell but it is still fun to bitch when we are all pissed…even though 90% of us do not have a clue all what is involved.

---

<div class="post-metadata">

### Author: ![grandamld9](https://avatars.discourse-cdn.com/v4/letter/g/48db29/32.png) [@grandamld9](https://forums.speedlife.net/u/grandamld9)
#### Post date: [June 7, 2007, 5:59pm UTC](https://forums.speedlife.net/t/parkway-feedback/190359/38 "2007-06-07T17:59:55Z")

</div>

> [@There is a storm a coming](https://forums.speedlife.net/t/there-is-a-storm-a-coming/30569/30):
>
> the birmingham bridge is totally unnecessary at this time. i’m sure its not falling down, the deck was in mint shape! part of the problem is we use all these evironmentally safe crap in building materials and the shit just doesn’t last like it used to. concrete is crap, paint is crap.
> 
> the major problem with the way people merge in this city is the way merge points are designed. the SQ exits is the most idiotic piece of engineering the causes most of the traffic delays on the parkway east outbound. on on ramp 50 yards before an off ramp!!! WTF. the lower decks of the ft pitt and ft duq bridge are another of the engineering flops in this city.

I also love the how people coming from the monroville area that take the sq/homestead exit dont seem to understand what YEILD means, ive almost been sideswipped more times lthen i can count while im comming outbound and taking the greenfeild exit.

---

<div class="post-metadata">

### Author: ![Darkstar](https://avatars.discourse-cdn.com/v4/letter/d/b487fb/32.png) [@Darkstar](https://forums.speedlife.net/u/Darkstar)
#### Post date: [June 7, 2007, 10:06pm UTC](https://forums.speedlife.net/t/parkway-feedback/190359/39 "2007-06-07T22:06:40Z")

</div>

> [@fresh"](#):
>
> but just like most jobs there are dependencies…in this case time, money, supplies, and weather. those guys standing around are doing so because they have to wait until the other guy finishes what he is doing before the rest can move on. the process cannot be rushed.

horseshit. maybe on some of the more extensive stuff like bridge renovations but there’s no reason that you cant pave fast.

[Previous page](https://forums.speedlife.net/t/parkway-feedback/190359.md?page=1)
