# parkway feedback

**URL:** <https://forums.speedlife.net/t/parkway-feedback/190359>\
**Category:** PittSpeed Off Topic\
**Created:** [June 6, 2007, 11:03am UTC](https://forums.speedlife.net/t/parkway-feedback/190359 "2007-06-06T11:03:14Z")\
**Posts on this page:** 1\
**Showing post:** 14

<div class="post-metadata">

**Author:** ![fshowcars](https://yyz2.discourse-cdn.com/flex034/user_avatar/forums.speedlife.net/fshowcars/32/5937_2.png) [@fshowcars](https://forums.speedlife.net/u/fshowcars)\
**Post date:** [June 6, 2007, 1:17pm UTC](https://forums.speedlife.net/t/parkway-feedback/190359/14 "2007-06-06T13:17:15Z")

</div>

> [@Dyno: 07 ZO6](https://forums.speedlife.net/t/dyno-07-zo6/30473/16):
>
> In defense of PennDOT the work going on with the bridges in those areas has to be done immediately because they are deteriorating…so do you want to suffer through the long traffic periods for a few months or chance the possibility of the bridge caving in on you as you pass under or fall out beneath you? PennDOT’s aim is to keep YOU safe.
> 
> Besides, it’s not PennDOT out there working (in most cases); those are construction crews that are consultants. PennDOT does the designing and these consultants are the ones that take their good old time.

the work wouldn’t have to be done immediately if the maintenance was done over the life of the bridges… period.

---

_[View the full topic](https://forums.speedlife.net/t/parkway-feedback/190359)._
