# parkway feedback

**URL:** https://forums.speedlife.net/t/parkway-feedback/190359
**Category:** PittSpeed Off Topic
**Created:** [June 6, 2007, 11:03am UTC](https://forums.speedlife.net/t/parkway-feedback/190359 "2007-06-06T11:03:14Z")
**Posts on this page:** 1
**Showing post:** 38

<div class="post-metadata">

### Author: ![grandamld9](https://avatars.discourse-cdn.com/v4/letter/g/48db29/32.png) [@grandamld9](https://forums.speedlife.net/u/grandamld9)
#### Post date: [June 7, 2007, 5:59pm UTC](https://forums.speedlife.net/t/parkway-feedback/190359/38 "2007-06-07T17:59:55Z")

</div>

> [@There is a storm a coming](https://forums.speedlife.net/t/there-is-a-storm-a-coming/30569/30):
>
> the birmingham bridge is totally unnecessary at this time. i’m sure its not falling down, the deck was in mint shape! part of the problem is we use all these evironmentally safe crap in building materials and the shit just doesn’t last like it used to. concrete is crap, paint is crap.
> 
> the major problem with the way people merge in this city is the way merge points are designed. the SQ exits is the most idiotic piece of engineering the causes most of the traffic delays on the parkway east outbound. on on ramp 50 yards before an off ramp!!! WTF. the lower decks of the ft pitt and ft duq bridge are another of the engineering flops in this city.

I also love the how people coming from the monroville area that take the sq/homestead exit dont seem to understand what YEILD means, ive almost been sideswipped more times lthen i can count while im comming outbound and taking the greenfeild exit.

---

_[View the full topic](https://forums.speedlife.net/t/parkway-feedback/190359)._
