# RT 28 and construction

**URL:** <https://forums.speedlife.net/t/rt-28-and-construction/191695>\
**Category:** PittSpeed Off Topic\
**Created:** [August 9, 2007, 12:10pm UTC](https://forums.speedlife.net/t/rt-28-and-construction/191695 "2007-08-09T12:10:44Z")\
**Posts on this page:** 1\
**Showing post:** 21

<div class="post-metadata">

**Author:** ![Habib88](https://yyz2.discourse-cdn.com/flex034/user_avatar/forums.speedlife.net/habib88/32/3341_2.png) [@Habib88](https://forums.speedlife.net/u/Habib88)\
**Post date:** [August 13, 2007, 2:09pm UTC](https://forums.speedlife.net/t/rt-28-and-construction/191695/21 "2007-08-13T14:09:41Z")

</div>

> [@FS: Gillette Fusion 4pk Razor Blades $8 each](https://forums.speedlife.net/t/fs-gillette-fusion-4pk-razor-blades-8-each/30435/6):
>
> I drive it everyday into town 8-5 from Sarver area. It needs 3 lanes during rush hour IMO. Don’t get me wrong, the rock slides need taken care of asap… but the road is a horror show during rush hours.

Agreed. While they are doing the northbound they should go ahead and just make southbound from the Mills to at least RIDC 3 lanes also. Since its not like the morning commute is any better. Right now I don’t think thats currently part of the deal, just the northbound lane addition and moving the southbound lanes away from the hillside. That and the single lane southbound section down by fox chapel also needs to go. Everyone either slows down to a crawl to make that turn, or they run up the exit then dart over at the last second.

---

_[View the full topic](https://forums.speedlife.net/t/rt-28-and-construction/191695)._
