Well that was the plan. However as construction projects of this magnitude go we’re running a typical 6 months or so late. Churches also tend to build/spend when the funds are in place and not float big loans to get the project going. Some other site prep work was required to get things underway and now the job is in full song. If you remember the parking lot area to the right of the building between the building and the hillside. That area is now completely gone. The only vehicles parked there now are loaders and dump trucks preparing for a huge addition to the building. The new lot up on the hill is slated to have 300 lined spaces with a grassy area which should fit a couple hundred more. The logistics of the whole thing will surely drive us crazy for the early part of the season. Again…PLEASE be patient with us. :slight_smile: