Local Rapper

With you on that. PennDot / contractors love working on 29 /30 major roads AT THE SAME TIME !

79 /65 is all fucked up took me 2 weeks to realize after the reversing of ramps i can get home in 10 minutes instead of 35 from work.
NO FUCKING SIGNS and the state flower( ORANGE and WHITE plastic signs blocking everything ) !!!

http://www.tcpofms.com/signguy_small2.gif