Here is what I have left to do:
1)Measure, cut and assemble my SS braided oil lines for the oil cooler/filter relocation kit
2)Have a vband 3" o2 housing made
3)Have a 3" DP and catback made which I might just buy because Hybrid is way backed up.
4)Buy an exhaust manifold
5)Wire up my Defi gauges and WB02
Then we are finished.