So… since i have my daughter on the way… i decided to make a office in the basement and start getting the nursery done where my computers used to be upstairs… this was all built in 1 week.
The man Cave… start to finish. 1 week project. thanks to: Dan,Snakebite and Pat ’ pat smoked cigs and held up some drywall with his gut
#1 there was a old bench in my way and some fucked up wiring and lighting.
#2 had to do some foundation/wall repair
#3 all fixed including block windows
#4 drink beer and put up walls
#5 wiring for outlets
#6 pick out some pimp recessed lighting
#7 wire some more
#8 drywall
#9 door ’ no its not crooked, just fucked up angle i snapped pic on
#10 8 foot black marble style desk
#11 32" plasma, carpet, outlet covers etc
Pics make room look small but its not small like the pics make it out to be.
Ill update thread when i wall mount the other 32" plasma and 4 more 22" monitors and get the air brushing done on back wall
funny ya said that, im just about done doing it. already did it with cable line. just gotta go get a bit more wire. putting up another box where other 32" is going also. i love the clean look.
Not a fan of how you ran the wires for the lighting. You should have drilled through the floor supports instead of mashing them between the sheetrock and the supports. Definitely would have put an outlet behind the tv too. I’m sure you’ll get some base molding in soon too.
Aside from those qualms, I think finished basements rock. Instant equity
edit: I think I have the same lights up in my kitchen.
i did drill through the floor beams… the yellow wire is the wire i ran. the white wire is another wire that was there. i also ran that threw holes in the beams
base molding i just got, gotta do. remember. start to finish in 1 week for all this takes a normal person alot longer. so now its just the finishing touches./