user “Buffalo” on myspace had this bulletin, figured I’d post it up
Underway right now-
“200 Delaware” Embassy Suites, Condo and Office Complex is finally getting it’s glass skin as of yesterday. Sneak preview of the codos available during the 'Downtown Housing Tour" Satuday, June 28th.
“Federal Courthouse” the steel is going up this week- see photos in our blog. 10 story, all glass and very Modern structure will be a “WoW” Factor to Niagara Sqaure and Downtown.
“Buffalo Creek Casino” foundation is done, the steel is next. Mix of a Grand Casino, 22 story Hotel, spas, restaurants, retail, surrounded by a park with man made streams.
www.
senecagamingcorporation. com
“Waterfront Development” Inner Harbor/Canal District Phase 1 is complete with replica 19th. Century bridges, a new Navel Museum/Cafe, Boardwalk, Old style lights and concerts coming this summer. Phase 2 will include a Mega Bass Pro Shop surrounded by other national retail/restaurants in old style builds with possible office/residence/hotels on the upper levels.
(Details coming this summer- keep a look out)
“Downtown Beach” or “Erie Basin Beach” just south of the Marina Tower, sand and a board walk (still expanding), no swimming yet, but the pubic is encouraged to use the space, bring a towel, lawn chair, a camera and enjoy the scenery.
“Main Street- 700 Block” This summer the re-opening of Main Street to Auto Traffic will begin on this part of the block with Two-Way trafffic along Main and Tupper with a median in the middle of Main Street and possible large Clock and other street improvements. Should be completed by this Fall followed by work on the Theatre District and beyond.