[quote=“Viper966,post:5,topic:34876"”]
why not just weld/roll a bead at the end of each pipe and put t-bolt clampm on that? ive never had a hose slip off a beeded end
[/quote]
it is beaded. it has tbolt clamps. the pipes don’t align perfectly, and this was much easier.
It only took an hour to do.