So, with everyone doing their home improvements and upgrades, how many pulled permits for everything and what inspections are you dealing with?
I’ve got a bunch of stuff I want to do to my place that are decent-sized projects, but I don’t want to get nailed if I don’t pull a permit… not sure how Cheektowaga is on things like Electrical and Plumbing done my the DIYer…
Remodeled the kitchen, finished half the basement, put up a shed, installed ~80’ of stockade fence… have yet to file a permit. Amherst. The fence was done in two days, everything else was inside.
I have files for 2.
One for drain tile and another for me new roof
They wanted to inspect the pipes on the drainage, and ice shield on my roof.
They never did come to look at my ice shield and I surely was not waiting around
If I’m doing stuff inside, its none of the towns business
Only thing I pulled apermit for was my deck. I live in Buffalo, went down to City Hall to get the permit…think it was $35 or so. Inspector never showed up! I did call the gas company and they came out before I dug, so after that I wasn’t worried about anything.
No permit pulled for the garage, not sure if this will ever be a problem?
Good to know info. I have wondered how bad West Seneca would be about rebuilding a shed (8’ x 8’) where an existing shed is. Are sheds anything to worry about? What about if I wire it if it was previously not wired?
+1 Haha. It’s contagious this time of year. I too have some plans as always for the inside. The shed is next spring.