Been workin on this for awhile now with a buddy of mine. Just finally snagged some pics of the progress we’ve made. I have about 40hrs or so in smoothing the engine bay, and had to have surgery so I wasnt able to finish it(paintwork and final skim coat). So it looks alright but me and the owner are going to re-do it over the winter b/c theres a few spots im not thrilled with. Theres a long way to go on the build, and ill keep snagging pics as we go. Enjoy!
Not at all. The engine/trans are connected and bolted to the K-Member. Once we get the billet K-Member spacers it can all be bolted up, hit up the trans mount and thats done. Putting the front clip back on will take about an hour at tops. Need to weld the tabs for the shocks on the rear end and that can be all bolted together. Kevin’s coming over to do the re-wire, and were damn near there. A solid 2 8hr days and it should be damn near done.