it was about $2000 with the doors wood renting the auger nails joist hangers stairs etc. I saved probably $2000 in labor doing it myself.
now all you need is a fire pole from the upper deck to the lower one!! Multi use as a stripper pole?
looks nice, not sure if i would have had that small step on the top run. but other then that looks great.
Eh, that was the size of the stringer, I didnt feel like cutting it down.
looks great!
THat looks great man.
Good Job
Your deck turned out great… good job man. I paid about $250 for my doors, originally wanted french doors… but our kitchen table is in front of the doors, so it didn’t make any sense.
I really don’t want to hijack… but its kinda creepy…
http://www.nyspeed.com/forums/showthread.php?p=1044549#post1044549
how much did just the deck cost you? if you dont mind me asking.
:word:
after doing all that nice work why did you cheap out on the railings?
Im not really concerned with the railings, I was gonna buy black metal tube ones but I think next year after I do put the second layer on I will get really nice ones. These are somewhat temporary.
OOOOOoOooooo IC. I got the black metal tubes.
quick hijack
That would be them. They look great.
I didnt wantto spend an extra $600 on the rails right now, when I get back from my Honeymoon I will be getting a new Marble counter, mosaic tile back splash, sink etc. for my kitchen.