some pics/vid of my bimmer w/updates(56k no way)

thanks again everyone. this project is taking longer then i was hoping.:frowning: oh well.

props go to matt (91crxsi) for most of the wrap job. I only helped here and there cause i was busy with gay maintenance shit that nobody likes to do.lol

here is some more progress pics. Manifold is now coated with high temp silicone sealer. here are some pics of the manifold installed with downpipe.

also some pics with my turdblow wrapped with a diy kit turbo blanket from summit. here is a link http://store.summitracing.com/partdetail.asp?autofilter=1&part=THE-15003&N=700+115&autoview=sku

only 35bucs and there is tons of extra material left over :buttrock

and here is a shot of the walker dynomax butted-style clamp. this clamp allows you to butt to pipes of the same diameter together. i needed to brake up the downpipe into 2 sections because it was next to impossible to install it.
http://store.summitracing.com/partdetail.asp?autofilter=1&part=WLK-33278&N=700+115&autoview=sku

only 9bucs so i figured id try it out. cheaper then a vband. ive heard mixed reviews on these clamps but we shall see.

all left is charge pipe to intercooler and oil return line and dump tube. then i think im all set. id like to brace the downpipe to the tranny with a bracket. we shall see what i can whip up.