as soon as i get done putting her back together. I am in the process of rebuilding and adding a couple things. It should be done in about 2 weeks, i take that back, it WILL be done in less then 2 weeks, but i can start another thread or something and go over my build.
you know i dont even remember, i am sure it was from ka-t.org, it has to have been from there. I highly doubt i would have found this on bikis website, or altimas.net
Thanks for the welcome everyone, and yes i am here to make sure that Altimas rule the world, one boosted altima after another
it was YOU, yeah man, although my setup is getting closer and closer to be doing, i just hope that the machine shop calls tomorow and says that my head is done, just hit me up man
AMS Rebuild Kit:
Arias 8.8:1 Pistons
AMS Forgesd Rods
ARP Hardware all around
Full Gasket Set
Calico Coated main and head bearings
Fully machined Block and head w/3 angle valve job (no PnP)
Then little things to make the car run better.
-Switched to T-Bolt Clamps
-Got the ic piping shortened a little and painted it
-Went to stainless vac lines all around through a golden eagle vac manifold
-Mech instead of elec oil pressure gauge
-Biki-Rom ECU instead of JWT
-And then just cleaning and painting the engine bay, relocating fuses, and making things look a lot nicer.