Where I am at right now.

-fuel lines hooked up along with the fuel pressure gauge
-vacuum lines are hooked up minus BOV
-lower harness installed except for the transmission because I need to swap out the ca sensors with the ka sensors. different plug ends
-all the coolant lines are hooked up

To do:
-finish fabbing up the throttle body for the SOHC cable
-install downpipe and test pipe(when it comes in)
-install power steering hard lines(when they come in)
-install driveshaft
-fab the IC piping and get it welded
-modify the new engine harness and install it
-fab an intake pipe
-install walbro fuel pump
-relocate the battery
-fab up the fan and wire it in

I think thats it for the list. A week left I’m quite sure.